wuuyo banner


Mobile App


welcome

Welcome to Umeme
Uganda’s number one power distributor

safety

Transparency: If you see something say something.

Yaka


Social Media


 

  • @MahanRajesh Rajesh that is really unfortunate. Please share with your meter number and telephone contact for further investigation. /EA

    Umeme Limited on TwitterUmeme Limited 5 hours, 21 minutes ago

  • @taremwa2016 Apologies, we understand this has taken long. The engineer confirms the transformer will be replaced by tomorrow evening. /EA

    Umeme Limited on TwitterUmeme Limited 6 hours, 3 minutes ago

  • @Vugafrica Power is off due to a planned shutdown for maintenance works until 5:00pm. Apologies for the inconveniences caused. /EA

    Umeme Limited on TwitterUmeme Limited 6 hours, 24 minutes ago

  • @HiRolla1 Sorry for the delayed response. Our system was down. The technician has confirmed supply has been restored. Please confirm. /EA

    Umeme Limited on TwitterUmeme Limited 6 hours, 30 minutes ago

  • @ptwino Apologies for the delayed response,our system was down. Our technical team confirms restoration, please confirm. /EA

    Umeme Limited on TwitterUmeme Limited 6 hours, 34 minutes ago

  • @ptwino Apologies, according to the field team, power should be back on. Please confirm if yours has been restored. /EA

    Umeme Limited on TwitterUmeme Limited 6 hours, 44 minutes ago

  • @iamBarnet Our field team confirm that power is restored. Kindly confirm if yours is back too. /EA

    Umeme Limited on TwitterUmeme Limited 6 hours, 46 minutes ago

  • Read More